Warning: Can't synchronize with the repository (The 'repository_dir' has changed, a 'trac-admin resync' operation is needed.). Look in the Trac log for more information.

Schevo Team Rating

(draft)

The Schevo Rework Barriers? rendered many efforts and results useless. The executing analyst was not able to fulfill the tasks (and thus getting the planed benefits/results out of the cooperation).

The following thread was posted to give the project lead a public opportunity to correct the behaviour:

A further reply was not possibly, because the access on the list was blocked.

Mr. O'Brian posted later a message to another thread, clarifying some misinformation that was spreaded using the message above.

(to be continued)